In production environments the technical question is usually secondary to the scheduling question. A modification that takes four hours instead of two is not a technical failure, it is a production loss — and the plan is judged on that.
We prepare and follow up work with the production calendar as the governing constraint: realistic durations, sequences that can actually be executed in the slot, and contingency that is planned rather than improvised.