Sector

Chemicals & Petrochemicals

Where the procedure exists because something went wrong somewhere before.

What makes it different

The paperwork is part of the engineering

On a chemical site, the permit system, the isolation procedure and the management-of-change process are not administrative overhead — they are the safety case. A modification that is technically sound but poorly documented is not acceptable, and will not be accepted.

We work inside those systems rather than around them: change properly assessed, isolations verified, documentation complete before the installation goes back into service.

Typical scopes

What we are usually asked to carry here

Management of change

Technical assessment and documentation for modifications to a live process.

Turnaround scopes

Preparation and follow-up for work concentrated into a shutdown period.

ATEX and zoned areas

Engineering and supervision for work in classified zones.

Planning around

The constraints that drive the plan

These are the things that decide whether a scope in this sector is realistic. We work them out before committing to a date.

Working in this sector?

Describe the installation and the scope. We will tell you what we would want to know before quoting a date.