Energy installations are rarely available when it suits the project. Work happens in narrow outage windows, alongside live high-voltage equipment, under regulatory regimes that require the paperwork to be right before anything moves.
That puts the weight on preparation. A scope that is properly engineered and sequenced before the window opens gets done; one that is still being figured out on the day does not.